2. Mär 2023
Chicago Host OS upgrade
Dear customers:
Due to too many bugs in the OLD OS system, we will upgrade the host OS version, From 0:00 am on 3.3rd~It is expected to be down for 30min-1 hour, we apologize for the inconvenience caused to you.
6. Jan 2023
Chicago Nework Fault (restored)
Due to the failure of the upstream power supply, the ALL network and the cabinet were powered off. The failure lasted for 10 hours and was restored at 11:00.
We were informed by the datacenter management that "there is a power related issue with [their] transfer switch". They are aware of this problem and are working to resolve it as soon as ...
19. Dez 2022
Chicago network upgrade
The 1GX2 lacp could not withstand the heavy traffic of the host machine. After 2 months of waiting, the 10G nic was finally replaced.
18. Apr 2020
Relocation of cabinets in the Los Angeles area (completed)
The relocation of cabinets in the Los Angeles area was rescheduled to 4.x.x at 5:00 a.m., and the expected interruption time is 1 to 3 hours.